 |
 |
|
 |
|
|
|
|
|
|
there is an
extreme lack of workrooms for students at the faculty for architecture
at the university of applied science cologne. because there are no
room reserves inside of the main complex, an outsourcing will be necessary
and would solve the proplem of early closing times in a simple manner.
the car park at the back of the faculty is a suitable place for temporary
buildings, as long as parking spaces and trees are kept. the pavilions
are accessed and connected with the main complex via a stud link.
a clearance height of 3 meters has to be ensured. the pavilions are,
suitable to the students situation, of temporary character. concept,
construction, matrial and structural design should reflect this. |
|
|
|
|
|